Call Us

M-F: 10am – 8pm

Closed Weekends

Concrete Safety Manager Refresher

  • mi
  • 1/100 Students
  • Concrete Courses
  • 0 Lessons /0 Quizes

Course Required for: License Continuing Education

Purpose: This course is a renewal requirement for the holder a NYC Department of Building Concrete safety Manager License.

Duration: 8 Hours of instructional time, excluding breaks & meals

NYC Requirements: To review a Concrete Safety Manager License, the applicant must complete & submit to the Licensing Unit a certificate of completion for 8 hours of training as mandated by the 2014 NYC Construction Codes, Building Code, Chapter 33 §3310.9.1 Concrete Safety Manager; Local Law 40-2008; Title 1 of Rules of the City of New York – Section 3310-02 Concrete Safety Managers; Chapter 100 Administration Sub chapter D Licensing & Registration of Businesses, Trades & Occupations engaged in Building Work §104-06 Continuing Education Requirements.

Course Content Requirements Instruction Delivery Method
1 . Introduction to Concrete Safety Management
• Site Safety Manager & Coordinator Description
• Construction Superintendent Description
• Concrete Safety Manager Description
• Fire Safety Manager Description
Classroom Lecture/Discussion w A/V
2. Concrete Construction Site Accidents
• Common Causes & Prevention
• Accident Statistics
• Case Studies w/Photos
Classroom Lecture/Discussion w A/V
3. Responsibilities of a Concrete Safety Manager/Certification Classroom Lecture/Discussion w A/V
• Building & Construction Sites that require a Concrete
Safety Manager
• Concrete Safety Managers- Duties from Title 1 Rules of
the City of New York – Chapter 33 §3310-02.
• Day in the Life of a Concrete Safety Manager using the
Concrete Safety Manager Inspections Checklist
Classroom Lecture/Discussion w H/O
(Provide Copy)
• Steps to get or renew a Certificate
• Discipline/suspension/revocation of a Certification
4. OSHA 1926 Overview
• Safety & Health Regulations for Construction
• Focus on Subpart Q – Concrete & Masonry Construction
Classroom Lecture/Discussion w A/V
5. NYC Codes Overview – cover all applicable codes, rules,
related department policy statements, regulatory notices,
bulletins and memos including:
• Title 1 Rules of the City of New York
o Chapter 3300 §3310-02 Concrete Safety Managers
• NYC Fire Code’08
o Chapter 14 Fire Safety during Construction,
Alteration & Demolition
• NYC Department of Transportation (DOT)
o Regulations & Permits
o Traffic & Traffic Control
o Manual on Uniform Traffic Control Devices
• NYC Department of Environmental Protection (DEP)
o Regulations for Concrete Disposal BC 3320
• Building Code ’68 – All applicable concrete sections still in
effect
• Construction Codes ’08 – General Administrative
Provisions
• Building Code ‘08 – All applicable sections including:
o Update Pages/Local Laws promulgated after July
1, 2008;
o Chapter 1 Administration – Permits, Maintenance,
Enforcement & Licensing;
o Chapter 19 Concrete;
o Chapter 35 Reference Standards;
• Building Code ’22 – All applicable sections including:

o Chapter 17 Structural Tests and Special
Inspections
o Chapter 18 Soils and Foundations including:
• 1812.1.1 Materials
• 1812.1.3 Concrete or Grout Placement
• 1815.7 Grout Sampling and Testing
o Chapter 19 Concrete
o Chapter 33 Safeguards during Construction or
Demolition

6. NYC Department of Buildings Overview – cover all applicable:
• Administrative standard operating procedures,
• Policy & procedure notices,
• Permits/department notifications,
• Forms,
• Filing & site documents,
• Plans,
• Inspection checklists/logs and
• Wind & weather advisories
Classroom Lecture/Discussion w A/V
7. Concrete Construction & Stripping Operations
• Formwork Design
• Rebar Handling
• Concrete Pumping
• Hazardous Materials BC 3313
• Material Handling Equipment BC 3320
• Shoring & Reshoring
• Protection of Pedestrians BC 3307
• Safety Netting BC 3308
Classroom Demonstration w A/V
Classroom Demonstration w A/V
Classroom Demonstration w A/V
Classroom Lecture/Discussion w A/V
Classroom Demonstration w A/V
Classroom Demonstration w A/V
Classroom Demonstration w A/V
Classroom Demonstration w A/V
8. Concrete Inspection Operations
• Pre-Placement,
• Placement &
• Post-Placement
Classroom Demonstration w A/V
9. Rigging, Scaffold, Hoisting, Lift, & Crane Operations
• Scaffolds BC 3314
• Material Hoists BC 3317
• Personal Hoists BC 3318
• Cranes & Derricks BC3319 including Signaling
Classroom Demonstration w A/V
10. Site Safety Plan Requirements for Concrete Classroom Lecture/Discussion w A/V
11. Safety Protocols for Concrete – including:
• Fall Protection for existing & new concrete-embedded fall
arresting systems
Classroom Lecture/Discussion w A/V
12. Jobsite Concrete Safety Violations Classroom Lecture/Discussion w A/V
13. Safe Use of Concrete Tools on the Jobsite Classroom Lecture/Discussion w A/V
14. Reoccurring Jobsite Concrete Safety Problems Classroom Lecture/Discussion w A/V
15. Jobsite Emergency Situations & Preparedness Procedures Classroom Lecture/Discussion w A/V
16. Handouts

• NYC Buildings Unsafe Condition (311) Notification
Procedure
Provide Copy to Trainee & Discuss
• NYC/DOI Buildings Integrity Training Contact Information
Sheet
• Building Bulletin 2021-003
• Concrete Safety Manager Inspections Checklist
17. Review all Training Topics Discussion with Questions & Answers
18. Written (Multiple Choice) Test Classroom

Free
Enroll
You cannot enroll on this course because you are not logged in.

Additional Details

  • 4 Weeks
  • 50 points
  • May 22, 2025 5:22 pm
Best Seller